Planning
Physical Development:
Planning is the fundamental issue in the process
of city development. During plan preparation RAJUK follows certain principles,
which include National Urban Policy, Project Design, Planning, Multi Sector
Investment Program and existing Policies and Programs of different Agencies.
Construction:
RAJUK is one of the lead "Construction Actor" in
the development process of Dhaka. The main activities include construction of
roads, box-culverts/culverts and bridges and also development, excavation and
filling of land.
Planning and Designing:
Planning and design are the basic stage of
construction. Project preparation, feasibility study, project programming and
time scheduling are directly under the planning component.
Design includes:
Conceptual Design
Selection of Materials
Design and Construction Code and Standards
Analysis of Dimensions and their Verification
Detailed Drawings
Detailed Qualities and Estimate of Materials.
Development Control
The Town Improvement Act 1953:
City area is changing continuously through
development activities by different actors like government agencies, private
developers, individuals and others. Planned urban growth is mainly based on the
development control measures. Land use control in urban areas of Bangladesh is
initiated with the adoption of the Town Improvement Act 1953.
The East Bengal Building Construction Act
1952:
The East Bengal Building Construction Act, 1952,
(amended 1987) is also considered a legal document for development control.
Rules, regulations and ordinances of the City Authorities are also being
exercised for this purpose. Every construction requires permission as per
provision of `The East Bengal Building Construction Act 1952 (amended 1987) (EBBC
Act 1952)'. The developing agencies are empowered for planning permission and
approval of building plans and prevent illegal constructions in the metropolitan
areas.
Land Use Planning Rules:
Statutory rules control land use according to
planning standards. It is based on land use policies including local plans, such
as control of residential density, road standard, maintenance providing of
infrastructure and services. The acts and the master plans of the cities are the
principal legal instruments, which force and exercise planning control and
standards.
The land use of metropolitan Dhaka ought to follow
the provision of the City Master Plan. Housing, commercial and industrial
project buildings need planning permission, which are generally practiced. It
must be in conformity with the land use provision of the Master Plan.
Building Construction Rules:
According to the `East Bengal Building
Construction Act-1952 (amended 1987)', each and every building within the
designated areas of City `Master Plan’ needs approval from the City Development
Agencies. As per Acts, the definition of building is: `Building includes a
house, hut, wall and any other structure where of masonry bricks, corrugated
iron sheet, metal tires wood, bamboo, mud, leaves, grass, thatch or any other
materials whatsoever'.
The Act has empowered to initiate building rules
under section 18, EBSC Act 1952 which has been updated, based on public
interest, regularly since 1954, (in 1984, and in 1996). It has been formulated
through the Government of Bangladesh exercising the power of the Act.
Authorized Sections and Building
Construction (BC) Committees:
RAJUK has a Development Control Section
(Authorized Section). Previously this section was comprised with two Authorized
Officers, two Assistant Authorized Officers, four Chief Building Inspectors, 50
Building Inspectors and other staff. Now the number of Authorized Section
increased in four (4) instead of two (2) by increasing the staff members and
demarking the areas specified under control of each authorized jurisdiction.
These sections are supported by the four Building Construction (BC) Committees
headed by the Members (Planning and Development) for approval of the building
plans and exercising the powers of the Act for planned growth of the city.
Other Activities
RAJUK as a prime Planning Authority represents
Bangladesh as well as Dhaka City in various National and International Seminars,
Symposiums and Workshops held in home and in abroad. RAJUK tries to incorporate
and share the ideas and concepts related to planning and development adopted or
practiced in different part of the World. RAJUK participates in various training
programs to improve the organizational capabilities. RAJUK is an active member
of CITYNET, SAARC-SHELTERNET and HABITAT-II.
RAJUK organize Seminars and Workshops on different
Urban issues in regular basis, the seminar on World Habitat Day is an example.
Legal Aspects
A National Legal Consultant
needed to be engage for an appropriate period to:
Prepare a legislative framework
for the metropolitan level governance structure for Dhaka.
Prepare a legal framework for
adoption of the Plan.
Draft suitable national
legislation or legal instruments enabling land re-adjustment schemes to be
undertaken in Dhaka.
The Plan attempted to draft
Interim Planning Rules into a Semi-legal format, there will still be required
some legal expertise to enable them to be legally acceptable and operational in
the Bangladesh context. It could be done by the approach realistically
formulated by an experienced National Legal Consultant who is familiar with
Planning Laws in Bangladesh.
Functions of
Planning Section
Authorized Sections and Building Construction
Committee:
RAJUK control all the development
activities of Dhaka City under the provisions of Town Improvement Acts,
Building Construction Rules and Land Use Regulations within the
area under its jurisdiction. Any use of land or any type of construction needs
approval or clearance from RAJUK and Authorized Sections are responsible
for issuing those land use clearances. Till very recent past RAJUK dealt with
only two (2) Authorized Sections and each Authorised Section provided and served
with 1 Authorized Officer, 1 Assistant Authorized Officer, 2 Chief Building
Inspectors, 25 Building Inspectors and Sub Inspectors.
Under a notification issued by the government in 7th
February 2001, the number of Authorized Section increased from 2 to 4 by some
structural modifications. The areas of jurisdiction also specified for each
Authorized Section. They are being well supported by the Building Construction
Committees consist of 7 members and headed by the Members (Planning and
Development). Each Authorized Section comprised with 1 Authorized Officers, 1
Assistant Authorized Officer, 1 Chief Building Inspector, 6 Building Inspectors
and 10 Building Sub-Inspectors. Each Authorized Section has specified with its
own areas of jurisdiction. BC committees were inactive for a period of 3 months
(from 05.01 2000 to 12.02.2001) due to reorganize the committee and transferring
and appointing new Member (Planning).
Land Use Clearance and Deviation in
Plans/Constructions:
Land use clearances have found some or major
deviations when constructing the buildings and seemed to be regular practice
almost in every cases of approved plans. These happened due to non-applications
of powers and lack in enforcement of building constructions rules and
regulations. Negligence in duties, intention to forgo some specific cases, poor
inspection and reporting and political influence made Authorized Section a
fearsome part of the organization. In case of some critical issues, clients or
developers some how manage the authority for land use clearances for particular
areas where development is restricted for specific purpose. Peoples claimed that
the files/plans are not approved properly and sites are not inspected as per
given parameters. The unnecessary harassment or time killing or missing of
specific files or put objections on files are most common practice dealing the
Authorized Sections. The overall performance of this section is not up to the
mark as mentioned by the clients.
In some cases the process of plan or building
construction approval or clearance delayed due to some undefined circumstances
and caused peoples to take alternative solutions. Misuse of power and Act also
shown by the Authority as claimed by the clients create unnecessary harassment
and delay. The provisions of Act clearly defined that the plans should be
forwarded for clearance or approval within 45 days and if, any objection made in
the plan must be notified within 30 days after submission for approval. In fact
the process sometimes take more time as specified in the Act and in many cases
it takes years to get the approval. RAJUK’s Authorized Sections are carrying out
and dealing the process of development control and responsible for issuing land
use clearance or approval for building plans under the provision of TI Act.
Building Heights and Regulation:
Civil Aviation Authority is now very much worried
about building heights and high-rise constructions within the city area and
trying to solve this problem as early as possible. Though they are not submitted
any clear proposals defining or indicating the buffer where the developments to
be controlled. Civil Aviation Authority not asking RAJUK for any clarification
about height zone or land use clearance procedures for high rises or not given
any guidelines for height restrictions. Meanwhile RAJUK is trying to develop,
include and enforce some legal frameworks to limit building heights and
constructions of high rises.
RAJUK has taken the issue seriously and making
liaison with the concern authorities and departments to incorporate the ideas
and suggestions for better control and check the growing tendency of high-rise
buildings in and around the region close to the air traffic and vulnerable
areas. There is need to be defined a clear, understandable and implement
oriented rules and regulations to restrict building heights in
specific/restricted areas. Building heights to be limited and to be varied in
terms of location and environment.
Department of Environment (DOE) has imposed
objection and made restrictions over land use clearance for high-rise buildings
to protect environmental hazards and degradation of environmental quality and
thus asked for prior approval. There is no such restriction imposed for
constructing buildings up to 6-storied, but need prior approval from concern
agencies and departments those who provide urban services and facilities.
|