Proposed Intercity Channel Rehabilitation and Berthing Points Installation Scheme

PROPOSED ENCIRCLING/INTRACITY CHANNEL REHABILITATION AND BERTHING POINTS INSTALLATION SCHEME

 

Sl No

Section

Cost Total

Tk. Lac.

Type-A

Type-B

Type-C

Cannels as per biwta

Terminal location

Implementing agency

1

FROM KELLAR MORR TO BALU-LAKHYA CONFLUENCE

 

ABOUT 43.5 km

 

 

 

SADARGHAT  (EXISTING)

BIWTA

2

FROM KELAR MORR TO MIRPUR BRIDGE

 

 

ABOUT 11.75 km

 

 

AMINBAZAR (PROPOSED)

BIWTA

3

FROM MIRPUR BRIDGE TO BALU-LAKHYA CONFLUENCE TRAVERSING THE NORTHERN PERIPHERY

 

 

 

ABOUT 40 km  (PROPOSED)

 

TONGI

BIWTA

4

CENTRAL TRANSPROT TERMINAL (MULTI LEVEL-MULTI MODAL)

 

 

 

 

 

NEAR RAMPURA

BRIDGE

BIWT/BR OTHERS

5

DEVELOPMENT OF GAZARIA KHAL FROM BALU RIVER TO RAMPURA K-2

 

 

 

 

ABOUT 5.7 km

 

BIWTA

6

DEVELOPMENT OF MANDA KHAL FROM TRIMOHINI TO MANDA K-3

 

 

 

 

ABOUT 5.0 km

 

BIWTA

7

DEVELOPMENT OF BEUPAR KHAL K-5

 

 

 

 

ABOUT 3.6 km

 

BIIVTA

8

DEVELOPMENT OF DUMNI KHAL K-5

 

 

 

 

ABOUT 2.5 km

 

BlWTA

9

DEVELOPMENT OF BHATARA KHAL K-7

 

 

 

 

ABOUT 2.6 km

 

BIWTA

10

DEVELOPMENT OF BADDA KHAL FROM GAZARIA TO MERADIA K-8

 

 

 

 

ABOUT 8.5 km

 

BIWTA

11

DEVELOPMENT OF ZIANI KHAL FROM TRIMOHINI TO NA"DIPARK-9

 

 

 

 

ABOUT 3.8 km

 

BIWTA