1. |
How can I know in which areas
you provide general land user permission order and in which areas use T1 ACT
75(I)/(II) rule? |
| |
If the criteria of land use in
certain area matches to the criteria and standards set by the Master plan of
1959 for that area, a direct land use permission can be given. However, for
any kind of deviation or mismatch to the Master plan the application have to
be proceed through the TI Act. |
|
2. |
Which documents must be
submitted to get the land use order and what is the fee? |
| |
For a normal land use clearance
of buildings up to six storied heights nothing is required except the
government fees. The fees structure is,
For Residential Building up to
6 storied height: Tk.400
For Residential cum Commercial
Building up to 6 storied height: Tk.400
For
Commercial/Warehouse/Industry up to 6 storied height: Tk.500
However, when building’s height
exceeds 6 storied the fees structure changes in addition to few prior
clearance certificates. The fees structure is,
For Residential
Building/Residential cum commercial Building more than 6 storied height:
Tk.500.
Prior clearance certificates
are required from the following organizations:
1. Directorate of Environment
2. Dhaka Electric Supply
Authority (DESA)
3. Water and Sewerage Supply
Authority (WASA)
4. TITAS Gas
5. Dhaka Metropolitan Police (DMP)
Traffic
6. Dhaka City Corporation (DCC)
7. Civil Aviation Authority
Bangladesh (CAAB) |
|
3. |
How long does it take to get a
land use order? |
| |
It takes more or less 3 weeks
to get a landuse order. |
|
4. |
Is there any requirement for
Land use order from RAJUK if one buys a plot from a private Housing company? |
| |
If the housing project of the
private housing company has it’s approval from RAJUK the landuse order is no
more required. Because it already has it’s approval for the whole project. |
| |
|
|
5. |
Which housing projects are
authorized by RAJUK? |
| |
A list.... |
|
6. |
Is Land use order required to
authorize a plane for RAJUK plot? |
| |
No further landuse order is
required for a RAJUK plot. Only the plan has to be certified from the
Authorized section of RAJUK. |
| |
|
|
7. |
Is it possible to authorize a
commercial or non-residential building design in residential plot? Is there
any law? |
| |
The authorization of commercial
or, non-residential building on a residential plot varies from place to
place. It depends on the type of landuse of the adjacent area. if there is a
government gazette for such change it is permitted at once. Otherwise, it
has to be done by the town Improvement Act. |
|
8. |
Which documents are required to
authorize a design? |
| |
The following documents are
required to authorize a design.
-
Deed
-
Duplicate Carbon Receipt (DCR)
-
Land Rent receipt
-
Mutation
-
Draft Publication From
-
7 copies of the plan (for
building up to 6 storied)
-
If the building has more than
6 stories, a structural design is required along with the prior clearance
certificates from the 9 organizations as mentioned in the 2nd answer.
|
|
9. |
How long does it
take to authorize a design? |
| |
It is done by the Authorized
Section of RAJUK. The Authorize section is bound the give the clearance
within 3 weeks. However, it varies with the frequency of their meeting.
|
|
10. |
How is a design plan approved
when land is in place surrounded by 10/12 buildings of each having 3 / 4
floors and which is beside a road which is actually 8′-10′ in width and having
no in the road? |
| |
No plan is approved without
minimum 10’ wide access and minimum 12’ wide road. If a lot fulfills none of
these requirements but has ample land for building private roads can pply
under the TI Act. However, such type of permission is very rare and
exceptional. |
|
11. |
What actions does RAJUK take
incase of illegal/unauthorized buildings? How these accusations are settled? |
| |
The building inspectors of
RAJUK are charged with continuous monitoring of all the uildings within the
RAJUK jurisdiction area. If they find any kind of deviation or, if any
eighbor complains against his neighbor regarding illegal construction,
building inspectors repares a notice to the violators. This notice is a 2C
type notice and asks to show the uthorization documents of the deviators
within certain time period. Such notice is send 3 imes. If the owner fails
to show the required documents in time RAJUK is empowered to emolish his
structure. |
|
12. |
What is the law of approval of a
plan when it is rejected? |
| |
If a plan is rejected the owner
can appeal in the appealed division of the BC committee. his committee
examines the plan again. If they find it satisfactory can approve it.
However, they can also reject it. |
|
13. |
Is there any law for approving a
design after a building is built without prior permission? |
| |
Yes, there is a law enacted
since 1987. Under this law it is said that if a building is constructed
without RAJUK’s approval but following all the regulations and set backs of
RAJUK then it is possible. But the owner will have to pay a 10 times
increased fees along with a minimum Tk. 5,000 fine (it can be more). |