Background of the Project
Dhaka Metropolitan city has now been turned into the busiest & densely populated city. People reside permanently in Dhaka city, the capital of Bangladesh for service, business and other purposes. The dwelling places required for these large number of people is very inadequate. As a result, the residential areas of Dhaka city are turning into over-crowded & dirty day by day.
It is possible to reduce the pressure of population of Dhaka to a great extent by developing the surrounding area of Dhaka city in a planned way and establishing permanent residence for these vast populations. The total area of the project is 2008.08 acres. The area is low-lying and not suitable for agriculture. Dhaka city is growing fast towards the north, for planned urbanization, it is necessary to extend the city. With this end in view preparations have been made to establish the proposed satellite town. The projected population in the project is more than 6.00 lacs with a density of around 300 persons per acre.
It is possible to reduce the pressure of population of Dhaka city to a great extent by developing surrounding area of Dhaka in
a planned way and es-tablishing parmanent residential accomodtion for the vast population.
Objective of the
Project
-
To reduce the pressure of population in Dhaka city by creating
opportunity of residence for the city dwellers in the closeby extended area.
-
To maintain the balance of environment by proper urbanization.
-
To reduce the existing acute problem of housing.
-
To expand civic facilities by urbanization of the area between Mirpur & Tongi
gradually.
-
Development of new township and to expand economic facilities.
-
To solve future housing demand.
Location of the Project:
“Uttara Residential Model Town (3rd Phase) Project” is situated at a distance about 20 km. from zero point of Dhaka City, Western side of Uttara Model Town (2nd Phase) Project, Northern side of Mirpur Cantonment and East side of Flood Protection Embankment through Mirpur-Ashulia.
Land Use Plan (Major component):
Residential Plots - 24.01%
Highrise appartment block - 10.68%
Road Network - 30.92%
Physical & Social infrastructure - 3.04%
Lake, Open space & Park - 13.00%
Commercial Plots - 5.00%
CBD - 0.92%
Utility Services - 2.53%
Education & Institution - 1.67%
Neighbourhood/Play field -3.02%
Present Position of the Project:
Site development: Site development works of sector 15 already completed. Works of Sector-16 & 18 almost completed and works of sector-17 is in progress.
Road Construction: Road Construction works of sector-15 already started & progress is going on.Remaining road construction will be started within a short time.
Bridge Construciton: Two bridges construction already started & progress is going on. Remaining bridge construction will be started soon.
Utility services: The utility services such as Electricity, Gas & Water supply line will be installed as early as possible and other services will be completed within project period.
Plot handing Over: The handing over of residential plots will be started from January 2010 & will be completed gradually at the earliest possible time.
|